Factory-built houses for construction companies and developers – HAWO
Factory-built houses for construction companies — HAWO as your partner
HAWO delivers ready-made houses to developers and construction companies from the factory to the site — with foundations, fully finished and turnkey. Residential projects are completed on a predictable budget and with a short lead time, without subcontractor chains or site condition risks. HAWO does not act as a developer and does not compete with its clients — we are your construction partner in every phase of the project.
HAWO’s concept is designed for serial production, which makes it well suited to professional builders. Our mission is to help our clients build more effortlessly and run a more profitable business!
What does HAWO deliver to a developer?
Every Hawo house is built entirely in the factory under indoor conditions and delivered to the site move-in ready — with an integrated steel foundation.
There is no construction site on the developer’s plot: installation takes one day. The cooperation scales from a single house to area development projects of dozens of units.
The delivery includes:
- •
Building permit drawings, or the entire permit process as a service
- •
FC-certified factory production in a dry chain
- •
Integrated steel foundation – no separate concrete casting on site
- •
Delivery and installation, move-in ready
- •
Energy performance certificate and warranty

House collection for developers
The Hawo residential collection covers houses of 55–100 m², from individual single-family homes to detached houses. All models can be customized to suit the project and local building regulations.

Why is factory construction more profitable than on-site construction?
The profitability of residential production is decided before the first spade hits the ground. HAWO moves the variables of construction into controlled factory conditions — or removes them altogether.
- •
An exact price from the order — no extra invoices because of weather or subcontractors
- •
Factory production time of 30 working days on average — faster capital turnover
- •
The integrated steel foundation minimizes groundwork on site
- •
FC-certified process — quality documented, no site supervision
- •
HAWO handles the permits — the developer needs no property development organization of its own
- •
Serial production: the same concept is replicated from one project to the next without a learning curve

Idea gallery
HAWO’s idea gallery of residential projects shows example visualizations based on plans and completed projects.
1 / 14

How the HAWO partnership works in practice
The process is designed from the developer’s point of view: few steps, a lot of certainty.
- 1.
Contact and site assessment — we go through the plot, zoning restrictions and project scope
- 2.
Choice of model and customization — we choose from the collection or design a project-specific solution
- 3.
Quote and order — fixed total price, project budget and schedule are locked
- 4.
Factory production — about 30 working days, the client can visit the factory during production
- 5.
Delivery and installation — the house on site with a one-day installation, turnkey


Video of the HAWO process

The most common challenges in residential production — HAWO’s solution
The process is designed from the developer’s point of view: few steps, a lot of certainty.
| Challenge | HAWO’s solution |
|---|---|
| Schedules and costs overrun | Fixed-price factory production, locked delivery date |
| Weather dictates the pace of construction too much | 100% indoor production — weather has no effect |
| Availability of skilled labor on site | Not needed — HAWO delivers a finished house |
| Subcontractor chains and contract interfaces | No subcontractors on site — one supplier |
| Project profitability becomes unclear | One total price, one supplier, one invoice |

References from construction companies
Ask us more about our reference projects for construction companies!

Start planning your residential project
Tell us about your project – we will get back to you within 24 hours.

FAQ — Questions and answers
How does HAWO’s factory-built house make construction easier?
The house is built in the factory and delivered to the site move-in ready, with an integrated steel foundation. Installation is completed in one day, so the time on site and the hassle that comes with a construction project are reduced.
Read more: HAWO | State-of-the-art construction: factory-built houses
How does factory manufacturing of a move-in-ready Hawo house make construction easier?
The house is manufactured to your order step by step in the factory, where work phases can be supervised on the production line. Completed in about six weeks, the house is delivered to your site ready, so you do not need to coordinate every phase of building the house yourself.
Read more: HAWO construction method and concept
What needs to be done on the plot before a Hawo house is installed?
The groundwork must be complete before the complete house is delivered to the site. We provide the groundwork contractor with instructions and dimension drawings for the locations of the utility connections and frost insulation. In a ground-supported solution, no separate foundations are needed, because the steel foundation is part of the house. Installation usually takes one day.
Read more: HAWO construction method and concept
How is a Hawo house completed?
A Hawo house is built step by step on a production line in the factory and delivered to the site in one piece, move-in ready. A frame is built on the steel foundation manufactured in the factory, then insulated and clad. All the house’s HVAC, plumbing and electrical work, furnishing, finishing and even the final cleaning are done in the factory before delivery.
Read more: HAWO construction method and concept
How does a factory-built HAWO house reduce the risks of a construction project?
The house is built indoors, so weather or the availability of workers do not disrupt the schedule. The integrated steel foundation removes the need for concrete casting on site, and installation is completed in a day. Quality documentation, the energy performance certificate and warranties bring additional certainty.
Read more: HAWO | State-of-the-art construction: factory-built houses
How quickly is a Hawo house installed?
Installing a Hawo house usually takes only one day. Lifting and lowering the house takes less than an hour, and finishing work such as removing the transport plastics and installing the steps, canopies and plinth boards usually takes a couple of hours.
Read more: HAWO construction method and concept
What advantages does HAWO’s steel foundation bring to construction?
HAWO’s steel foundation enables innovative factory construction and a modern building concept that has positively surprised our clients. It makes it possible to manufacture buildings of up to 100 m² of floor area in the factory and transport them to the site in one piece.
Read more: Article: What on earth is a steel foundation? (in Finnish)
What advantages does HAWO’s steel foundation offer in construction?
HAWO’s steel foundation solution eliminates the problems of slow and expensive construction as well as allergy and moisture problems, because it uses no concrete. It is also a safe choice in terms of building physics.
Read more: Article: What on earth is a steel foundation? (in Finnish)
How does HAWO’s steel foundation benefit the house builder?
The concrete-free base floor is designed to support healthy indoor air and to reduce allergy and moisture problems. Based on load-bearing corrugated steel sheets and a PUR-foamed cellular structure, the solution makes it possible to manufacture complete houses in the factory on top of a light but load-bearing base floor. Factory construction shortens the total construction time of a house by several months.
Read more: Article: What on earth is a steel foundation? (in Finnish)
How does a steel foundation make building a house easier?
The light but rigid steel foundation makes it possible to build an entire house in the factory, foundation included, and move it to the building site. Concrete would be too heavy to transport, so steel brings a new, efficient option to construction.
Read more: Article: What on earth is a steel foundation? (in Finnish)